ASME PCC-2 in the API 510 Pressure Vessel Inspector exam
Repair of Pressure Equipment and Piping. Our API 510 Pressure Vessel Inspector bank draws 805 of its 6,091 questions from this publication — 13% — and they cite 103 different clauses, 74 of them open book. The clause list below is counted from those questions, not copied from a syllabus.
Clauses the questions cite
The 40 most cited of 103, in document order. The number is how many questions in our bank reference that clause.
What they ask about
Free sample question from ASME PCC-2
The original construction code called for a flexibility analysis. How then must the weld buildup be handled?
- A. It is exempt from flexibility requirements.
- B. Reconciliation of the effect against the original analysis is required. ✓
- C. The pipe must be replaced rather than repaired. with responsibility for the outcome left where it falls
- D. A new hydrostatic test is the only requirement.
- E. The buildup must be 2 times thicker than calculated. with the repair organisation left to interpret the rest
The effect of the weld buildup must be reconciled with the original flexibility analysis or qualified by engineered design. ASME_PCC2, Article 202-3.1.3.1(k) / 202-3.2.1.5
Other publications in this exam
Counts are from AssetronX’s own question bank and describe what we have written, not what the exam contains. AssetronX is an independent examination-preparation provider and is not affiliated with, endorsed by or accredited by any certifying body or standards organisation. The clause numbers refer to the publications’ own paragraphs; the publications themselves are not reproduced here.