ASME PCC-2 in the API 510 Pressure Vessel Inspector exam

Repair of Pressure Equipment and Piping. Our API 510 Pressure Vessel Inspector bank draws 805 of its 6,091 questions from this publication — 13% — and they cite 103 different clauses, 74 of them open book. The clause list below is counted from those questions, not copied from a syllabus.

Clauses the questions cite

The 40 most cited of 103, in document order. The number is how many questions in our bank reference that clause.

1.1 · 51.1.2 · 21.2 · 121.3 · 11.3.2 · 11.6.1 · 11.7 · 22.2 · 32.3 · 52.3.4 · 12.4 · 112.5 · 52.6 · 22.6.1 · 22.7 · 42.8 · 12.9 · 12.10 · 23.1 · 233.1.1.2 · 13.1.2.2 · 13.1.2.5 · 13.1.2.7 · 13.1.3.1 · 33.1.3.2 · 13.2 · 223.2.1.1 · 13.2.1.3 · 13.2.1.4 · 13.2.2 · 23.2.2.2 · 13.3 · 263.3.1 · 13.4 · 183.4.1 · 23.4.2 · 13.4.3 · 13.5 · 103.6 · 43.6.1 · 11

What they ask about

Design 78Fabrication 36Examination 28Testing 26Limitations 19Heat Treatment 10NDE Comparison 10Carbon equivalent for in-service welding 10Fillet welded patch setback 10Minimum size of a butt-welded insert plate 10Scope 8Welding 8Description 7Safety 6Hydrostatic Test 6Selecting a PCC-2 repair method 6Welded hot taps 6Flaw excavation without weld repair 6Scope of ASME PCC-2 6Shell and tube exchanger repairs 6External weld buildup applicability 6Fillet welded patch limitation 6Pressure versus tightness testing 6Weld overlay and clad restoration 6

Free sample question from ASME PCC-2

  1. The original construction code called for a flexibility analysis. How then must the weld buildup be handled?

    • A. It is exempt from flexibility requirements.
    • B. Reconciliation of the effect against the original analysis is required. ✓
    • C. The pipe must be replaced rather than repaired. with responsibility for the outcome left where it falls
    • D. A new hydrostatic test is the only requirement.
    • E. The buildup must be 2 times thicker than calculated. with the repair organisation left to interpret the rest

    The effect of the weld buildup must be reconciled with the original flexibility analysis or qualified by engineered design. ASME_PCC2, Article 202-3.1.3.1(k) / 202-3.2.1.5

All free API 510 Pressure Vessel Inspector questions

Other publications in this exam

API 510 Pressure Vessel Inspector exam guide6,091 API 510 Pressure Vessel Inspector questions

Counts are from AssetronX’s own question bank and describe what we have written, not what the exam contains. AssetronX is an independent examination-preparation provider and is not affiliated with, endorsed by or accredited by any certifying body or standards organisation. The clause numbers refer to the publications’ own paragraphs; the publications themselves are not reproduced here.